Connection and Use of System Code (CUSC) CAP170: System to generator operational intertripping scheme

Publication type:
Code modification
Publication date:
Last updated:
Topic:
Energy codes
Subtopic:
Connection and use of system code (CUSC)

This letter sets out Ofgem’s decision to reject CAP170. CAP170 proposed to amend the CUSC to introduce an administered price for intertrips behind particular transmission system boundaries.