P375: Settlement of Secondary BM Units using metering behind the site Boundary Point

Decision

Publication date

Industry sector

Transmission Network

The Authority has approved P375. This modification settles Secondary Balancing Mechanism (BM) Units using metering equipment behind the defined Boundary Point for Balancing Services (known as 'behind the Meter'), rather than settling using Metering Equipment at the Boundary Point.