Net Zero Pre-construction Work and Small Net Zero Projects Re-opener Governance Document

Guidance

Publication date

Industry sector

  • Distribution Network
  • Transmission Network

This document sets out the arrangements for gas transmission and gas distribution network companies to use the Net Zero Pre-construction Work and Small Net Zero Projects Re-opener – including details on the scope, process, and materiality thresholds. It will take effect from 1 April 2021.

We have consulted on the Net Zero Pre-construction Work and Small Net Zero Projects Re-opener Governance Document for the implementation of RIIO-2. This should be read in conjunction with Special Condition 3.9 of the Gas Transporter Licence.

We have received views on our draft of the Net Zero Pre-construction Work and Small Net Zero Projects Re-opener Governance Document and have taken into consideration those comments within the final publication.

This document and its content is in line with our Final Determinations.