Strategic Wider Works guidance

Publication date
21st October 2013
Information type
Policy area

This document provides information for Transmission Owners and other stakeholders on the Strategic Wider Works (SWW) arrangements that were introduced as part of RIIO-T1.

This Version 2 of the SWW Guidance amends and replaces the Guidance published in 2013, a copy of which is saved as a subsidiary document below.

Main document

Subsidiary documents