Grid Code C/12: Safety Management of Three Position Gas Insulated Switchgear (GIS) Earth Switches

Decision

Publication date

Grid Code change C/12 allows the option of Earthing before Points of Isolation are established when Gas Insulated Switchgear is used to undertake safety work on the national electricity transmission system.