DCRP19/05 Modifications to the Distribution Code and EREC G99 of the requirements for Fast Fault Current Injection

Decision

Publication date

This modification clarifies but does not change the requirements for Fast Fault Current Injection.  These requirements clarify the performance with regards to reactive power injection of distribution connected Type B, C and D Power Park Modules when a transmission system fault is present on the system.   

The Authority approved this modification on 29/10/19.