Cadent

We have awarded funding to four Cadent (formerly known as National Grid Gas Distribution) projects. You can find further information on the project and related documents under the publications and updates feed below.

Future Billing Methodology - 2016

Great Britain has relied predominantly on North Sea gas since the 1970s with regulations and the billing regime designed for this stable and reliable source of gas. The supply market is changing with more gases of differing qualities, such as biomethane, being injected into the network. The current billing methodology isn’t optimised to cater for significantly different quality gases. This project will develop options that may lead to new gas billing methodologies to better reflect the world of more varied gas qualities.

HyDeploy - 2016

The project will demonstrate on Keele University's private network that natural gas containing levels of hydrogen (10% to 20%) beyond those permitted by the current safety standards (0.1%) can be distributed and utilised safely. The project will provide evidence to contribute towards the case for allowing increased use of hydrogen on the network.

Commercial BioSNG Demonstration Plant - 2015

Developing a commercially viable facility that can process waste, covert it to synthetic biogas and distribute it through the existing gas network to consumers.

BioSNG Demonstration Plant - 2013

A project to build a demonstration plant testing the techno-economic feasibility of the thermal gasification of waste to produce pipeline quality renewable gas.

Publications and updates

  • Published: 3rd Feb 2017
  • Open letters & correspondence
  • 1 Associated documents
This direction sets the conditions of funding for National Grid Gas Distribution’s Network Innovation Competition project – HyDeploy.

  • Published: 3rd Feb 2017
  • Open letters & correspondence
  • 1 Associated documents
This direction sets the conditions of funding for National Grid Gas Distribution’s Network Innovation Competition project – Future Billing Methodology.

  • Published: 30th Nov 2016
  • Reports & plans
  • 3 Associated documents
See the non-confidential documents submitted by National Grid Gas Distribution to the Gas Network Innovation Competition (NIC) for the project entitled HyDeploy on which our decision to award NIC funding is based.

  • Published: 30th Nov 2016
  • Reports & plans
  • 3 Associated documents
See the non-confidential documents submitted by National Grid Gas Distribution to the Gas Network Innovation Competition (NIC) for the project entitled Future Billing Methodology on which our decision to award NIC funding is based.

  • Published: 12th Jan 2016
  • Open letters & correspondence
  • 1 Associated documents
This direction sets the conditions of funding for National Grid Gas Distribution’s Network Innovation Competition project -Commercial BioSNG Demonstration Plant.

  • Published: 30th Nov 2015
  • Reports & plans
  • 3 Associated documents
These are all the non-confidential documents submitted by National Grid Gas Plc (Distribution Networks) to the Gas Network Innovation Competition for the project entitled Commercial BioSNG Demonstration Plant on which our decision to award NIC funding is...

  • Published: 14th Sep 2015
  • Reports & plans
  • 1 Associated documents
This is the Six Monthly Report delivered by National Grid Gas Distribution on their Gas Network Innovation Competition project, BioSNG Demonstration Plant.

  • Published: 11th Feb 2015
  • Reports & plans
  • 1 Associated documents
This is the Six Monthly Report, delivered by National Grid Gas (Distribution) on their Gas NIC project: BioSNG Demonstration Plant.

  • Published: 21st Oct 2014
  • Reports & plans
  • 1 Associated documents
This is the Six Monthly Report, delivered by National Grid Gas Distribution on its Gas NIC project: BioSNG Demonstration Plant.

  • Published: 11th Jun 2014
  • Decisions
  • 1 Associated documents
This letter grants National Grid Gas (Distribution) a derogation from the Gas NIC banking requirements for the BioSNG Demonstration Plant project. The letter explains our reasons for granting the derogation and describes the conditions National Grid must...