Gas Transmission Charging Methodology Forum (TCMF) 

 

The Gas Transmission Charging Methodology Forum (TCMF) is an industry forum set up by National Grid Gas (NGG) that provides the means for transmission users to raise issues and provide comments on NGG modification proposals to its charging methodologies. 

Once the proposals have been formulated and consulted upon, Ofgem assesses the modifications against charging methodology objectives. Ofgem normally makes a decision as to whether or not to veto the proposed modification within 28 days of receipt of the final modification report (or within three months if an Impact Assessment is conducted).


DateTitle (Click for more document information)
19/12/2008Modification GCM12 Retrospective Negative TO Entry Commodity Charge and Separate Management of K
08/02/2008Modification Proposal NTS GCM 11 ‘Retrospective Negative TO Entry Commodity Charge’
08/02/2008Modification Proposal NTS GCM 10 ‘TO Entry Commodity Rebate Mechanism’
23/10/2007253/07 Modification Proposal NTS GCM 09-TO Over Recovery Mechanism
- (Reference number: 253/07)
11/07/2007Charging Modification Proposal GCM06
08/06/2007NTS GCM04 Decision Letter
24/04/200794/07 Modification proposals to the Gas Transmission Transportation Charging Methodology NTS GCM01 ‘Alternative methodologies for determination of NTS entry and exit capacity prices’
- (Reference number: 94/07)
06/03/200740/07 Charging arrangements associated with methodologies for determination of NTS entry and exit capacity prices
- (Reference number: 40/07)
21/02/200730/07 Gas Transmission Transportation Charging Methodology modification proposal GCM 01: Alternative methodologies for determination of NTS entry and exit capacity prices
- (Reference number: 30/07)
31/01/200719/07 Decision letter: NTS GCM03 Introduction of an SO Commodity Charge for NTS
- (Reference number: 19/07)
31/01/200719a/07 Uniform Network Code (UNC) 120V: Introduction of an SO Commodity Charge for NTS Storage Exit Flows
- (Reference number: 19a/07)
19/01/20079/07 Open Letter on the Conclusions Report on Transporation Charging Methodology Modification Proposal NTS GCM03 Introduction of an SO Commodity Charge for NTS Storage Facilities and Uniform Network Code Modification Report
- (Reference number: 9/07)