The gas transmission network, the National Transmission System (NTS), is the high pressure gas network which transports gas from the entry terminals to gas distribution networks or directly to power stations and other large industrial users. It is owned and operated by National Grid Gas plc (NGG).

 

Ofgem's development of gas transmission policy is dictated by its statutory obligations, in particular its principal objective to protect the interests of consumers, wherever appropriate by promoting effective competition.



DateTitle (Click for more document information)
03/02/2010National Grid Gas (NGG) Business Rates - Reapportionment
- (Reference number: 17/10)
20/01/2010Proposed disposal of part of National Grid’s National Transmission System for Carbon Capture and Storage: Publication of independent studies by Wood Mackenzie and Poyry Energy Consulting
- (Reference number: 7/10)
05/01/2010Modification of Special Condition C8D of National Grid Gas’s gas transporter licence
- (Reference number: 1/10)
08/12/2009Gas Entry Capacity Substitution Methodology – Approval decision letter
26/11/2009Review of entry capacity operational buy-back incentive and default incremental entry capacity lead time
- (Reference number: 142/09)
05/11/2009Proposal to release obligated incremental entry capacity at Hole House Farm
23/10/2009Modification of Special Condition C8D of National Grid's gas transporter licence
- (Reference number: 129/09)
18/09/2009Section 23 Notice (Special Condition C8D)
- (Reference number: 113/09)
21/08/2009Determining Revenue Drivers for Exit Points: Abernedd, Barking and Coryton
- (Reference number: 106/09)
12/08/2009Substitution licence change second consultation cover letter
- (Reference number: 103/09)
15/07/2009Approval of National Grid Gas's (NGG) Incremental Entry Capacity Release Methodology Statement 2009
03/07/2009Development of a methodology to implement National Transmission System (NTS) Entry Capacity Substitution
01/07/2009Proposed licence change to clarify substitution licence conditions
- (Reference number: 77/09)
30/06/2009Modification of Special Condition C8D of National Grid Gas’s gas transporter licence
- (Reference number: 74/09)
30/06/2009Modification of special condition C8E of National Grid Gas plc’s gas transporter licence
- (Reference number: 75/09)
22/06/2009Incremental Entry Capacity Release Methodology 2009: Audit derogation
22/06/2009Entry Capacity Trade and Transfer Methodology 2009 approval
29/05/2009Determining revenue drivers for entry and exit points: Canonbie and Gilwern
- (Reference number: 58/09)
29/05/2009Notice of modification of the special conditions of national grid gas plc’s gas transporter licence in respect of its national transmission system under section 23 of the gas act 1986 (Canonbie)
- (Reference number: 59/09)
29/05/2009Notice of modification of the special conditions of national grid gas plc’s gas transporter licence in respect of its national transmission system under section 23 of the gas act 1986 (Gilwern)
- (Reference number: 60/09)
08/04/2009Proposed disposal of part of National Transmission System (NTS) for Carbon Capture and Storage
- (Reference number: 35/09)
08/04/2009Determining Revenue Drivers for Entry and Exit Points: Canonbie and Gilwern
- (Reference number: 37/09)
31/03/2009NGG Network Model Licence Obligation Approval Letter
25/02/2009Review of entry capacity operational buy-back incentive and default incremental entry capacity lead time
- (Reference number: 11/09)
24/02/2009Derogation notice to delay the introduction of exit substitution and baseline revision methodology statements
- (Reference number: 10/09)
17/12/2008Derogation notice to delay the introduction of gas transmission entry capacity substitution
07/11/2008Proposal to release incremental obligated entry capacity at Burton Agnes (Caythorpe)
29/09/2008Approval Letter for NGG’s Transmission Planning Code 2008
15/07/2008Modification of the Gas Transporter Licence Under Section 23 of the Gas Act 1986
11/07/2008Incremental Entry Capacity Release (IECR) Methodology Statement 2008
30/06/2008Modification of the gas transporter licence under section 23 of the Gas Act 1986
- (Reference number: 90/08)
17/06/2008BBL interconnector expansion – approval of tariff
05/06/2008A report by PÖYRY Energy Consulting produces for the Gas Forum: Audit of National Grid's Interim Transfer and Trade Process
- (Reference number: 80/08)
30/05/2008NOTICE UNDER SECTION 23 OF THE GAS ACT 1986
- (Reference number: 73/08)
29/05/2008Modification of the gas transporter licence under section 23 of the Gas Act 1986
- (Reference number: 69/08)
20/05/2008BBL Gas Interconnector Expansion
- (Reference number: 66/08)
09/05/2008Notice under section 23 of Gas Act 1986 - to modify Special Condition C8G
- (Reference number: 62/08)
29/04/2008Notice Under Section 23(3) of the Gas Act 1986
24/10/2007255/07 Proposal to Release Incremental Obligated Entry Capacity at Isle of Grain
- (Reference number: 255/07)
19/06/2007148/07 - Open letter - National Grid Gas National Transmission System Entry Capacity: Development of the regime ahead of winter 2007/8
- (Reference number: 148/07)
30/05/2007Request for renewal of consent under Standard Special Condition A36 of NGG Plc's gas transporter licence
03/05/2007110/07 Notice under Section 23(3) of the Gas Act 1986
- (Reference number: 110/07)
15/12/2005Clarification of Ofgems role in relation to ARCAs
- (Reference number: 269/05)