| 29/12/2008 | UNC226 Aditional data requirements for the Administration of CSEP, Supply Points |
| 22/12/2008 | Ofgem fines Npower for misselling of energy - (Reference Number: R/38) |
| 22/12/2008 | Notice under section 30A of the Gas Act 1986 and section 27A of the Electricity Act 1989 |
| 19/12/2008 | Review of consents for Gas Transporter to Gas Transporter (GT-2-GT) services - (Reference Number: 174/08) |
| 19/12/2008 | Social tariff drive doubles uptake - (Reference Number: R/36) |
| 19/12/2008 | Ofgem's proposals could speed up connection of low carbon generation - (Reference Number: R/37) |
| 19/12/2008 | Minutes of the Meeting of the Gas and Electricity Markets Authority on 20 November 2008 |
| 19/12/2008 | Code Governance Review – role of code administrators and small participant/consumer initiatives - (Reference Number: 173/08) |
| 19/12/2008 | Code Governance Review: Major Policy Reviews and Self Governance - (Reference Number: 172/08) |
| 19/12/2008 | Monitoring Suppliers Social Spend 171/08 - (Reference Number: 171/08) |
| 19/12/2008 | Modification GCM12 Retrospective Negative TO Entry Commodity Charge and Separate Management of K |
| 19/12/2008 | 2007/08 Electricity Distribution Quality of Service Report - (Reference Number: 166/08) |
| 19/12/2008 | Transmission Access Review – Initial consultation on enhanced transmission investment incentives - (Reference Number: 175/08) |
| 19/12/2008 | Update on CUSC Amendment Proposal CAP148 |
| 19/12/2008 | UNC225 Revised Timescales for LDZ Shrinkage Arrangements |
| 19/12/2008 | UNC223 Provision of day ahead Gas Flow Nomination data at major Aggregated System Entry Points |
| 19/12/2008 | UNC218 Amendment to the base period used to define Seasonal Normal Weather |
| 19/12/2008 | Arcadia Petroleum Limited - Notice of revocation of gas shipper licence |
| 19/12/2008 | EGL UK Limited - Notice of grant of gas shipper licence |
| 19/12/2008 | MGT Power Limited - Notice of grant of electricity generation licence |
| 19/12/2008 | Wainstones Energy Limited - Notice of grant of electricity generation licence |
| 18/12/2008 | Sustainable development in the gas and electricity sectors |
| 18/12/2008 | Decision under Electricity Transmission Standard Licence Condition B17 Network Output Measures Part B |
| 18/12/2008 | Decision under Gas Transmission Special Licence Condition C13 Network Output Measures Part B |
| 18/12/2008 | Minutes of the Meeting of the Gas and Electricity Markets Authority on 16 October 2008 |
| 18/12/2008 | Request for derogation from standard condition C14 (Grid Code) ('SLC C14') of the electricity transmission licence of National Grid Electricity Transmission plc (NGET) - (Reference Number: 167/08) |
| 18/12/2008 | Decision on IDNO and DNO out of area use of system charges: reduction of the 3 month notice period for amending charges under SLC 14.20 - (Reference Number: 169/08) |
| 18/12/2008 | UNC201VV Small value invoice payment deferral |
| 17/12/2008 | Sustainable Development Report 2008 - (Reference number: 163/08) - (Reference Number: 163/08) |
| 17/12/2008 | Open letter: Price Control Pension Principle Questionnaire |
| 17/12/2008 | Derogation notice to delay the introduction of gas transmission entry capacity substitution |
| 17/12/2008 | Gas distribution quality of service report 2007-2008 - (Reference Number: 164/08) |
| 16/12/2008 | Ofgem probe has half a billion pounds in its sights for customers - (Reference Number: R/35) |
| 15/12/2008 | Authority decision on TNUoS charging methodology modification proposal GBECM-11 |
| 15/12/2008 | ES Pipelines metering charges statement - decision letter |
| 12/12/2008 | Workshops for electricity distribution price control review - Open letter |
| 11/12/2008 | Ofgem Investor Presentation - Offshore Transmission - 09.12.08 |
| 11/12/2008 | Next steps in delivering the electricity distribution structure of charges project - consultation - (Reference Number: 160/08) |
| 10/12/2008 | Code Administrators Working Group Meeting 2 Note - 01/10/2008 |
| 10/12/2008 | CP08-117 Cosmetic amendments to SPAA Schedule 12- Biscuit Data Dictionary |
| 10/12/2008 | CP08-116 Mandatory Provision of the NOSI Flow within 4WD |
| 09/12/2008 | Supplier of Last Resort: Revised Guidance |
| 09/12/2008 | Decision in relation to EDF Energy Networks modification proposal EDFE 023: cessation of upfront charging of Assessment and Design (A&D) Fees |
| 09/12/2008 | DCP030/030A Provision of cost information - decision letter |
| 05/12/2008 | Clawback of tax benefit due to excess gearing - Open letter |
| 05/12/2008 | Second consultation on 2010-2015 electricity distribution price control review - press release - (Reference Number: R/34) |
| 05/12/2008 | DCode 002 Changes to the Distribution Code for the incorporation of Independent Distribution Network Operators into Distribution Code Review Panel Governance |
| 05/12/2008 | Electricity Distribution Price Control Review Policy Paper - (Reference Number: 159/08) |
| 05/12/2008 | Code Administrators Working Group Meeting 3 Note - 29/10/2008 |
| 04/12/2008 | Arrangements for responding in the event that a network company experiences deteriorating financial health - (Reference Number: 158/08) |
| 02/12/2008 | Enduring Offtake Reform - resolution update |
| 02/12/2008 | Bonds Mill Estate Limited - Notice of application for a gas suppliers licence |
| 01/12/2008 | Getting Connected Workshop - Ofgem Slides - 01.12.08 |
| 01/12/2008 | RPI-X@20 workshop - Glasgow - 28 November |
| 01/12/2008 | Energy Logistics and Services GmbH - Notice of application for a gas shippers licence |
| 28/11/2008 | Enduring offtake reform - advice of delay to decision |
| 28/11/2008 | UNC199 Clarification around the application of the UNC Dispute Resolution Process |
| 28/11/2008 | Formal Information Request on Unaccounted For Gas |
| 28/11/2008 | FDS report on consumers' views of issues in the small business energy supply market |
| 28/11/2008 | Customer Engagement Survey undertaken by MORI |
| 28/11/2008 | FDS report on non vulnerable consumers' engagement with the energy market |
| 27/11/2008 | Minutes of the meeting of the Gas and Electricity Markets Authority on 18 September 2008 |
| 26/11/2008 | EDF Energy (IDNO) Ltd Decision on Licence Application |
| 26/11/2008 | DNO entry form for Priority Customer Care category of 2008/09 Customer service reward scheme |
| 26/11/2008 | Guidance notes for 2008/09 customer service reward scheme |
| 26/11/2008 | Corporate Social Responsibility entry form 2008-09 |
| 25/11/2008 | The Renewables Obligation late buyout - update on the total amounts redistributed |
| 24/11/2008 | Standard Licence Condition 15 reporting template |
| 24/11/2008 | Consultation on the discount for small transmission connected generators from 31 May 2009 - (Reference Number: 156/08) |
| 21/11/2008 | Transmission transparency project second implementation report - (Reference Number: 155/08) |
| 21/11/2008 | Review of Industry Code Governance - Environment and Code Objectives - (Reference Number: 154/08) |
| 20/11/2008 | QOS Incentive Scheme - Audit of Interruptions Reporting 2007.08 - Final Report |
| 20/11/2008 | Carbon Emissions Reduction Target update 02 - November 2008 |
| 20/11/2008 | D/08 Grid Code Requirements for Technical performance - decision letter |
| 20/11/2008 | UNC222 Amendment of Interconnector UK's Minimum Wobbe Limit |
| 20/11/2008 | Offshore Electricity Transmission – A Joint Ofgem/DECC Regulatory Policy Update - (Reference Number: 153/08) |
| 18/11/2008 | The "timing-out" of Authority decisions on modification proposals - (Reference Number: 152/08) |
| 18/11/2008 | EGL UK Limited - Notice of Application for a Gas Shipper licence |
| 14/11/2008 | EDFE 023 - EDFE proposal to modify the Connection Charging Methodology - cessation of upfront charging of Assessment and Design (A&D) |
| 13/11/2008 | Claiming for winter fuel payments |
| 13/11/2008 | Getting the best deal |
| 12/11/2008 | Decision in relation to modification proposal to modify Electricity North West Limited’s charging methodology: 2009/001/1 |
| 12/11/2008 | UNC192 Introduction of DNO Obligations to Facilitate Resoultion of Unresolved USRVs |
| 11/11/2008 | Connecting renewable generation - factsheet - (Reference Number: 76) |
| 11/11/2008 | Revised licence fee cost recovery principles following the Consumers, Estate Agents and Redress Act 2007 |
| 10/11/2008 | RPI-X@20 workshop - London - 7 November |
| 10/11/2008 | DCP018/18A Clarification of provision of metering data |
| 07/11/2008 | Proposal to release incremental obligated entry capacity at Burton Agnes (Caythorpe) |
| 07/11/2008 | Open letter regarding RPI-X@20 workshops |
| 07/11/2008 | RPI-X@20 update sheet |
| 07/11/2008 | Long-Term Electricity Network Scenarios (LENS) - final report - (Reference Number: 157/08) |
| 07/11/2008 | DPCR4 Reopener follow up letter 7 November 2008 |
| 07/11/2008 | Wyre Gas Transportation Limited - Notice of proposal to grant a gas transporter licence with modifications |
| 06/11/2008 | Ofgem Approved Meters- Schedule 4 List under The Meters (Certification) Regulations (1998) |
| 06/11/2008 | ECSG Minutes October 2008 |
| 06/11/2008 | Update letter on the DPCR5 process - (Reference Number: 151/08) |
| 06/11/2008 | MGT Power Limited - Notice of application for an electricity generation licence |
| 05/11/2008 | EDF & British Energy merger - call for views |
| 05/11/2008 | DPCR4 ESQCR Reopener ENW decision letter |
| 05/11/2008 | DPCR4 ESQCR Reopener CE decision letter |
| 05/11/2008 | DPCR4 ESQCR Reopener WPD decision letter |
| 04/11/2008 | Monitoring Company Performance Q2 2008 |
| 03/11/2008 | BBL reverse flow tariff decision letter |
| 03/11/2008 | Climate Change Levy: Renewables Exemption Guidance for Suppliers and Generators |
| 03/11/2008 | Consultation on IDNO and DNO out of area use of system charges: reduction of the 3 month notice period for amending charges under SLC 14(20) - (Reference Number: 149/08) |
| 03/11/2008 | EDFE 022 - EDFE proposal to modify the Connection Charging Methodology - cessation of upfront charging of Assessment and Design (A&D) |
| 03/11/2008 | Minutes of the 15th Meter Asset Manager's Code of Practice Meeting |
| 03/11/2008 | Minutes of the 14th Meter Asset Manager's Code of Practice Meeting |
| 31/10/2008 | Publication of the changes in the relevant Gas Transporters’ single supply point charge and in the Retail Price Index effective from 1 January 2009 pursuant to Special Condition 1 of the Independent Gas Transporters’ licences - (Reference Number: 148/08) |
| 31/10/2008 | Decision on National Grid’s proposal to commence generating electricity at Gas Distribution pressure reduction sites |
| 31/10/2008 | EDF Energy response - redrafting proposal |
| 30/10/2008 | Minutes of the meeting 17 July 2008 |
| 30/10/2008 | Wainstones Energy Limited - Notice of application for an electricity generation licence |
| 30/10/2008 | Consumer attitudes and awareness of green issues and energy |
| 30/10/2008 | Switching behaviour amongst vulnerable consumers |
| 29/10/2008 | Minutes of the meeting 19 June 2008 |
| 29/10/2008 | Code Administrator's Working Group Presentation - Meeting 3, 29 October 2008 |
| 28/10/2008 | Environmental Advisory Group meeting October 2008 - Agenda |
| 27/10/2008 | Unmetered Key Performance Indicator Service Level Agreement reporting template |
| 24/10/2008 | Charging Arrangements for Transmission Infrastructure Assets Local to Generation Connections (GBECM-11): Impact Assessment and Consultation - (Reference Number: 147/08) |
| 24/10/2008 | Decision in relation to Western Power Distribution (South West) Plc (“WPD”) modification proposal 008/001: Clarification of A & D fees. |
| 24/10/2008 | Decision in relation to Western Power Distribution (South Wales) Plc (“WPD”) modification proposal 008/001: Clarification of A & D fees. |
| 23/10/2008 | Last Resort Supply Direction made by the Gas and Electricity Markets Authority under standard condition 8 of the electricity supply licence granted or treated as granted under Section 6(1)(d) of the Electricity Act 1989 to British Gas Trading Limited |
| 23/10/2008 | MA Energy Limited - Notice of grant of electricity supply licence |
| 22/10/2008 | Code Administrators Working Group Meeting 4 Slides - 25/11/2008 |
| 22/10/2008 | Electricity 4 Business - Notice of revocation of electricity supply licence and reasons for revocation |
| 22/10/2008 | Customer Journey Workshop Minutes 7 October 2008 |
| 21/10/2008 | Derogation requests to facilitate earlier connection of generation - consultation on information required to facilitate Ofgem’s assessment and proposed revised guidance - (Reference Number: 146/08) |
| 21/10/2008 | ROC and LEC Timetable 2008/09 |
| 21/10/2008 | DCP016 More Open Website |
| 21/10/2008 | UNC215 Enduring Arrangments for Supply Point Capacity decrease at an Interruptible Supply Point |
| 21/10/2008 | Non-Domestic Energy Consumer Referral Path for Vulnerable and Disconnection cases to Consumer Direct & Consumer Focus (formerly known as new NCC) |
| 21/10/2008 | Consumer Focus (formerly known as new NCC) Case Handling Process |
| 21/10/2008 | Referral of Vulnerable & Off Supply Cases by Advice Agencies to Consumer Direct & Consumer Focus (formerly known as new NCC) |
| 21/10/2008 | Vulnerable Consumer Referral Path to Consumer Direct & Consumer Focus (formerly known as new NCC) |
| 20/10/2008 | DCP019 Moving Meters with Service Alterations |
| 17/10/2008 | Transmission Network Output Measures - Open Letter - (Reference Number: 144/08) |
| 17/10/2008 | P223 Profile Administrator Service |
| 17/10/2008 | P224 Reactive Power Flows Associated with Exemptable Generating Plant |
| 17/10/2008 | CP08-114 Telephone Service Provision for Agreed and Disputed Reads |
| 17/10/2008 | CP08-115 Removal of Metering Schedules Anonymity |
| 17/10/2008 | P217 Revised Tagging process and calculation of cash-out prices - (Reference Number: 145/08) |
| 16/10/2008 | P211: Main Imbalance price based on Ex-post Unconstrained Schedule P217: Revised Tagging Process and Calculation of Cash-out Prices |
| 14/10/2008 | Ofgem Response Statutory Consultation ROO 2009 |
| 13/10/2008 | Unmetered Key Performance Indicators |
| 13/10/2008 | DPCR4 reopener follow up letter |
| 13/10/2008 | CAP131 User Commitment for New and Existing Generators |
| 10/10/2008 | Price Control Pension Principles Seminar |
| 10/10/2008 | Code Administrator's Working Group Issues Log Version 1 - 28/08/2008 |
| 10/10/2008 | Notes from meeting 1 of the Code Administrators Working Group held 28/08/2008 |
| 10/10/2008 | Draft Terms of Reference for the Code Administrator's Working Group - 28/08/2008 |
| 10/10/2008 | Final Terms of Reference for the Code Administrator's Working Group - 01/10/2008 |
| 09/10/2008 | Customer Journey Workshop Group Minutes 23 September 2008 |
| 07/10/2008 | The Renewables Obligation buy-out fund (2007-2008) - press release - (Reference Number: R/33) |
| 07/10/2008 | SPM Housekeeping Mod COM-08-001b Decision Letter |
| 07/10/2008 | SPD Reinforcement Mod COM-08-002a Decision Letter |
| 07/10/2008 | SPM Reinforcement Mod COM-08-002b Decision Letter |
| 07/10/2008 | SPD Housekeeping Mod COM-08-001a Decision Letter |
| 06/10/2008 | Supply Market Probe Initial Findings - Analyst and Investor presentation |
| 06/10/2008 | Ofgem puts industry on notice to make markets work better for all - press release - (Reference Number: R/32) |
| 06/10/2008 | Energy Supply Probe - Summary of initial findings |
| 06/10/2008 | Energy Supply Probe - Initial Findings Report - (Reference Number: 140/08) |
| 06/10/2008 | BSC modification proposals on zonal transmission losses - review of Oxera's analysis - (Reference Number: 141/08) |
| 06/10/2008 | Offshore Electricity Transmission - Competitive Tender Process - (Reference Number: 142/08) |
| 03/10/2008 | RPI-X@20 - invite to workshops for interested stakeholders |
| 03/10/2008 | Renewable Energy Strategy response - (Reference Number: 139/08) |
| 02/10/2008 | "Is RPI-X still fit for purpose after 20 years?" - Beesley lecture, London, 2 October 2008 |
| 02/10/2008 | The energy supply market probe - factsheet |
| 02/10/2008 | Electricity demand will be met even in a harsh winter - press release - (Reference Number: R/31) |
| 02/10/2008 | National Grid's Winter Outlook 2008/9 Report - (Reference Number: 138/08) |
| 02/10/2008 | DCP029 Part 1 Housekeeping |
| 01/10/2008 | Gas and Electricity Licence Applications – Guidance |
| 01/10/2008 | Decision letter: Gas and electricity licence Application Regulations and Guidance Document |
| 01/10/2008 | New complaint handling standards go live today - press release - (Reference Number: R/30) |
| 01/10/2008 | Delivering the electricity distribution structure of charges project - (Reference Number: 135/08) |
| 01/10/2008 | Cornwall Energy Associates Presentation to the Code Administrator's Working Group - 01/10/2008 |
| 01/10/2008 | Good Energy Presentation to the Code Administrator's Working Group - 01/10/2008 |
| 01/10/2008 | E.ON UK presentation to the Code Administrator's Working Group - 01/10/2008 |
| 01/10/2008 | DCP021 Distribution Standard Licence Condition 4a review (DCP009) affecting Section 2B |
| 01/10/2008 | Notice under section 11A(3) of the Electricity Act 1989 - Collective Licence Modification intended to deliver the structure of charges project - (Reference Number: 137/08) |
| 01/10/2008 | Memorandum of Understanding between Ofgem and The Energy Ombudsman (Oct 2008) |
| 01/10/2008 | Decision letter - Modification of Licences and Codes to reflect the abolition of the Gas and Electricity Consumer Council (energywatch) and its replacement with the National Consumer Council |
| 30/09/2008 | Post implementation review - Free Gas Safety Checks - (Reference Number: 136/08) |
| 30/09/2008 | Review of xoserve Agency Charging Statement |
| 30/09/2008 | Grid Code decision letter - C08 Data Exchange |
| 29/09/2008 | Approval Letter for NGG’s Transmission Planning Code 2008 |
| 29/09/2008 | Tullow Oil SK Limited - Consent to transfer licence from Tullow Oil UK Limited |
| 29/09/2008 | Wingas Storage Enterprise Limited - Notice of grant of gas shipper licence |
| 26/09/2008 | Regulatory Arrangements for East West Cable One's two proposed GB-Irish electricity interconnectors - (Reference Number: 134/08) |
| 25/09/2008 | Market challenges: can GB learn from events in New England? |
| 25/09/2008 | Use of system charging methodology modification proposal GB ECM-11: Charging arrangements for generator local assets. |
| 25/09/2008 | WPD/WALES/008 - WPD Wales proposal to modify the connections charging methodology: Clarification relating to A & D Fees |
| 25/09/2008 | WPD/WEST/008 - WPD West proposal to modify the connections charging methodology: Clarification relating to A & D Fees |
| 24/09/2008 | Minutes for the IST Meeting 3 |
| 23/09/2008 | IST3 Governance Arrangements for In-Service Testing, Terms of Reference |
| 23/09/2008 | Customer Journey Workshop Minutes 10 September 2008 |
| 22/09/2008 | Consumer First research: Worst-served customers - (Reference Number: 133/08) |
| 22/09/2008 | Decision letter on retaining the Transitional Interruption Incentive |
| 19/09/2008 | Changes to consumer representation - factsheet |
| 19/09/2008 | NTS Exit Capacity Release Methodology Statement in respect of the Transitional Period |
| 18/09/2008 | Ofgem’s Simplification Plan 2008-2009 |
| 18/09/2008 | B/07 Improved Planning Code Data Exchange for Compliance Assessments |
| 17/09/2008 | Code Governance Review: Charging methodology governance options - (Reference Number: 132/08) |
| 16/09/2008 | Connecting the Scottish Islands - (Reference Number: 131/08) |
| 16/09/2008 | Monitoring Company Performance Q1 2008 |
| 15/09/2008 | COM-08-001a - SP Distribution proposal to modify the connections charging methodology: Housekeeping changes |
| 15/09/2008 | COM-08-002b - SP Manweb proposal to modify the connections charging methodology: Reinforcement Apportionment Rules |
| 15/09/2008 | COM-08-001b - SP Manweb proposal to modify the connections charging methodology: Housekeeping changes |
| 15/09/2008 | COM-08-002a - SP Distribution proposal to modify the connections charging methodology: Reinforcement Apportionment Rules |
| 12/09/2008 | DN interruption reform and Shipper participation |
| 12/09/2008 | IMAG Meeting 11 Minutes |
| 12/09/2008 | Minutes of the 13th MAMCoP Meeting |
| 11/09/2008 | The Introduction of National Transmission System (NTS) Entry Capacity Substitution |
| 11/09/2008 | IMAG Meeting 10 Minutes |
| 11/09/2008 | MA Energy Limited - Notice of application for an electricity supply licence |
| 11/09/2008 | Minutes of the 12th MAMCoP Meeting |
| 10/09/2008 | Beauly-Denny Public Inquiry Income Adjusting Event Determination and Notice |
| 10/09/2008 | Minutes of the 11th MAMCoP Meeting |
| 10/09/2008 | Customer Journey Workshop Minutes 26 August 2008 |
| 09/09/2008 | Winter Outlook Seminar, London, 10 September 2008 |
| 09/09/2008 | IMAG Meeting 09 Minutes |
| 09/09/2008 | Direction - National Grid Gas System Operator Incentives from 1 April 2008: Methane Emissions - (Reference Number: 130/08) |
| 09/09/2008 | Minutes of the 10th MAMCoP Meeting |
| 08/09/2008 | Recognised Guarantees of Origin 2008 |
| 08/09/2008 | IMAG Meeting 08 Minutes |
| 08/09/2008 | UNC202 Improvement to More Frequent Readings Provisions to allow benefits of AMR |
| 08/09/2008 | Minutes of the 9th MAMCoP Meeting |
| 07/09/2008 | IMAG Meeting 07 Minutes |
| 07/09/2008 | Minutes of the 8th MAMCoP Meeting |
| 06/09/2008 | IMAG Meeting 06 Minutes |
| 05/09/2008 | IMAG Meeting 05 Minutes |
| 05/09/2008 | Commonly used terms |
| 05/09/2008 | Decision in relation to use of system methodology modification proposal EDFE 021: Introduction of a power flow/LRIC based methodology along with HV/LV generator charging in EDF Energy Networks Limited's (EDF) south east (SPN) network area |
| 05/09/2008 | Decision in relation to SP's (SPD) modification proposal PR-08-002: Implementation of the 'G3' Use of System Charging Methodology |
| 05/09/2008 | Decision in relation to SP's (SPM) modification proposal PR-08-002: Implementation of the 'G3' Use of System Charging Methodology |
| 05/09/2008 | Minutes of the 7th MAMCoP Meeting |
| 04/09/2008 | Undergrounding in AONBs and National Parks - DPCR4 Matrix |
| 04/09/2008 | IMAG Meeting 04 Minutes |
| 04/09/2008 | CERT: GLOSSARY OF COMMONLY USED TERMS - (Reference Number: ) |
| 04/09/2008 | Chevron Limited - Notice of grant of gas supply licence |
| 04/09/2008 | Chevron Limited - Notice of grant of gas shipper licence |
| 04/09/2008 | SSE Hornsea Limited - Notice of grant of gas shipper licence |
| 04/09/2008 | Minutes of the 6th MAMCoP Meeting |
| 04/09/2008 | Free sensor lamps for distributing partners |
| 04/09/2008 | SHP declaration before action commences |
| 04/09/2008 | Standard consumer utilisation and evaluation monitoring questions |
| 04/09/2008 | Microgeneration additionality declaration |
| 04/09/2008 | New build declaration |
| 04/09/2008 | SHP declaration when action finishes |
| 04/09/2008 | Monitoring requirements for standard measures |
| 04/09/2008 | Free CFLs for distributing partners |
| 04/09/2008 | Technical Monitoring form |
| 03/09/2008 | Biodiesel glycerol and the Renewables Obligation - (Reference Number: 129/08) |
| 03/09/2008 | IMAG Meeting 03 Minutes |
| 03/09/2008 | CP07-109 Changes to SPAA Schedule 23 to facilitate User Pays services |
| 03/09/2008 | CP08-112 Clarification to Clause 8.4 of Schedule 22 SPAA Metering Schedule |
| 02/09/2008 | Changes to the licence fee cost recovery principles following the Consumers, Estate Agents and Redress Act 2007 - (Reference Number: 128/08) |
| 02/09/2008 | IMAG Meeting 02 Minutes |
| 02/09/2008 | DCP027 Invoicing |
| 02/09/2008 | DCP028 Timescales associated with cheque processing |
| 02/09/2008 | Consent to extension of timescales for issuing a connection offer |
| 02/09/2008 | Minutes of the 5th MAMCoP Meeting |
| 01/09/2008 | Ofgem recruitment policy |
| 01/09/2008 | IMAG Meeting 01 Minutes |
| 01/09/2008 | Minutes of the 4th MAMCoP Meeting |
| 01/09/2008 | A review of the Energy Efficiency Commitment 2005-2008 |
| 31/08/2008 | Minutes of the 3rd MAMCoP Meeting |
| 30/08/2008 | Minutes of the 2nd MAMCoP Meeting |
| 29/08/2008 | Long-Term Electricity Network Scenarios (LENS) - Draft Scenarios Report and Fourth Consultation - (Reference Number: 127/08) |
| 29/08/2008 | Minutes of the 1st MAMCoP Meeting |
| 28/08/2008 | Carbon Emissions Reduction Target Update 01 - August 2008 |
| 28/08/2008 | Ofgem Introduction to the Code Administrator's Working Group - 28/08/2008 |
| 28/08/2008 | UNC Presentation to the Code Administrator's Working Group - 28/08/2008 |
| 28/08/2008 | BSC Presentation to the Code Administrators Working Group - 28/08/2008 |
| 28/08/2008 | MRA, SPAA and DCUSA Presentation to the Code Administrator's Working Group - 28/08/2008 |
| 28/08/2008 | CUSC Presentation to the Code Administrator's Working Group - 28/08/2008 |
| 28/08/2008 | DCP025 Ofgem Notices |
| 28/08/2008 | Modification Decision Letter on Back of Bills |
| 27/08/2008 | ECSG Minutes July 2008 |
| 27/08/2008 | Decision in relation to modification proposal SEPD/08/001A : Cost Apportionment Rules and Housekeeping Changes (SEPD) |
| 27/08/2008 | Decision in relation to modification proposal SHEPD/08/001A : Cost Apportionment Rules and Housekeeping Changes (SHEPD) |
| 27/08/2008 | UNC210 Implementation of DNPC03 (LDZ System Charges - Capacity / Commodity Split and Interruptible Discounts), the Alignment of Failure to Interrupt Charges and the Alignment of the IFA Charge |
| 27/08/2008 | Vayu Limited - Notice of grant of a gas supplier licence |
| 27/08/2008 | Vayu Limited - Notice of grant of a gas shipper licence |
| 27/08/2008 | ECG (Distribution) Limited - Notice of grant of an electricity distribution licence |
| 27/08/2008 | Consultation on modification of licences and codes to reflect the abolition of energywatch and its replacement with NCC - (Reference Number: 126/08) |
| 26/08/2008 | Wyre Gas Transportation Limited - Notice of application for a gas transporter licence |
| 26/08/2008 | Customer Journey Workshop Minutes 14 August 2008 |
| 22/08/2008 | Consultation and impact assessment on ENW/2009/001.1 ENW proposal to modify their Use of System Charging methodology Package Mod: revised DRM for Service Model, Cost Allocation, Revenue Reconciliation, IDNO tariffs and HV/LV generator tariffs - (Reference Number: 125/08) |
| 22/08/2008 | B/08 Grid Code Requirements for Power Park Modules - Voltage Control and Reactive power |
| 22/08/2008 | UNC216 Introduction of an Additional Discretionary Release Mechanism for NTS Entry Capacity |
| 21/08/2008 | Ofgem’s Five Year Strategy 2009-2014 - (Reference Number: 124/08) |
| 20/08/2008 | Transmission Access Review Conclusions - Stuart Cook (Ofgem) |
| 20/08/2008 | Transmission Access Investment Study - Chandra Trikha (SHETL) |
| 20/08/2008 | Network Investment - 2020 - John Overton (BERR) |
| 20/08/2008 | Transmission Access Review - National Grid's View - Alison Kay (National Grid) |
| 18/08/2008 | Section 11 Direction for NGET's SO incentives 2008/09: Transmission Losses Revised Volume Target |
| 15/08/2008 | Customer Journey Workshop Minutes 29 July 2008 |
| 14/08/2008 | Connections Assessment and Design (A&D) fees levied by Electricity Distribution Network Operators (DNOs) - (Reference Number: 123/08) |
| 14/08/2008 | RES and Grid Issues - Duarte Figueira (BERR) |
| 14/08/2008 | TAR Dissemination Event - Welcome and Introduction - Steve Smith (Ofgem) |
| 14/08/2008 | CAP160 Improvements to the assessment of Amendments |
| 13/08/2008 | Gas Distribution Networks Guaranteed Standards of Performance and licence condition D10 data from May 2005 to March 2008 |
| 12/08/2008 | OFGEM Information Charter |
| 11/08/2008 | E-Public Register Survey |
| 11/08/2008 | Sub-deducts networks survey |
| 11/08/2008 | Modification P217 Impact Assessment - (Reference Number: 122/08) |
| 11/08/2008 | Cover Letter - National Grid Gas System Operator Incentives from 1 April 2008: Environmental Incentive - Methane Emissions: amendment of Final Proposals - (Reference Number: 121/08) |
| 08/08/2008 | DCP032 ENA Address Change |
| 07/08/2008 | Price Control Pension Principles - (Reference Number: 120/08) |
| 07/08/2008 | P225 Housekeeping Modification: Updating References to the Party Service Lines |
| 07/08/2008 | SHEPD/08/001A Proposal to modify the connections charging methodology: Amending the description of Cost Apportionment Rules and housekeeping changes |
| 07/08/2008 | Chevron Limited - Notice of application for a gas shipper and gas supply licence |
| 07/08/2008 | Wingas Storage Enterprise Limited - Notice of application for a gas shipper licence |
| 06/08/2008 | National Grid Electricity Transmission and National Grid Licence Amendment to Include an Income Adjustment Term - (Reference Number: 114/08) |
| 06/08/2008 | EDF Energy (IDNO) Ltd - Licence Application Formal Consultation - (Reference Number: 115/08) |
| 06/08/2008 | Electricity Distribution Customer Service Reward Scheme 2007/08 - (Reference Number: 116/08) |
| 06/08/2008 | Notice Under Section 8(A)(3) Electricity Act 1989 - EDF Energy (IDNO) Ltd - (Reference Number: 117/08) |
| 06/08/2008 | Notice Under Section 11 Electricity Act 1989 - EDF Energy Networks (SPN) plc - (Reference Number: 119/08) |
| 06/08/2008 | Notice Under Section 11 Electricity Act 1989 - EDF Energy Networks (LPN) plc - (Reference Number: 118/08) |
| 05/08/2008 | Gas and electricity licence applications - Application Regulations and Guidance Document - (Reference Number: 113/08) |
| 05/08/2008 | Ofgem review prompts first quarter fall in disconnections - press release - (Reference Number: R/29) |
| 05/08/2008 | Industry Codes Governance Review - Code Administrators Working Group - Covering letter |
| 05/08/2008 | Renewables Obligation - Interim Total Obligation Levels for 2007-08 |
| 05/08/2008 | Monitoring Company Performance Q4 2007 |
| 05/08/2008 | Monitoring Company Performance Annual 2007 |
| 05/08/2008 | Suppliers Social Obligations Monitoring Report 2007 - (Reference Number: 112/08) |
| 01/08/2008 | Publication of Gas Distribution Quality of Service Regulatory Instructions and Guidance - (Reference Number: 111/08) |
| 01/08/2008 | A review of the Energy Efficiency Commitment 2005-2008 - (Reference Number: 109/08) |
| 01/08/2008 | Decision in relation to modification proposal PR-008-001a: Amendment of use of system charging methodologies for IDNO networks (SPD) |
| 01/08/2008 | Decision in relation to modification proposal PR-008-001a: Amendment of use of system charging methodologies for IDNO networks (SPM) |
| 01/08/2008 | iGTUNC019 Panel Membership Rules |
| 01/08/2008 | iGTUNC018 Determination of Implementation Dates by Panel |
| 01/08/2008 | IPL/QPL037 Invoice Credits |
| 01/08/2008 | iGTUNC017 Change Plan for Modification Process |
| 01/08/2008 | Energy Demand Research Project; review of progress June 2008 - (Reference Number: 110/08) |
| 30/07/2008 | Note of Ofgem BERR joint external communications session – 7 July 2008 |
| 30/07/2008 | GDN interruption reform - next steps for capex reopener |
| 29/07/2008 | DSWG Agenda 16 July 2008 |
| 29/07/2008 | Customer Journey Workshop Minutes 16 July 2008 |
| 28/07/2008 | Business and Enterprise Select Committee report: Energy prices, fuel poverty and Ofgem |
| 28/07/2008 | CA029 Investigation of a Relevant Interruption of a User and Interruption Payment obligations associated with such an interruption |
| 28/07/2008 | Tullow Oil SK Limited - Notice of proposal to transfer a gas shipper licence |
| 25/07/2008 | Social tariffs must equal suppliers’ cheapest deals - (Reference Number: R/27) |
| 25/07/2008 | Regulators in north west Europe encourage greater transparency to help gas network users - (Reference Number: R/28) |
| 25/07/2008 | Transmission transparency project first implementation report - (Reference Number: 107/08) |
| 25/07/2008 | Consumer First Research for DPCR5 Quantitative Findings - (Reference Number: 106/08) |
| 25/07/2008 | Monitoring suppliers' social initiatives - (Reference Number: 105/08) |
| 25/07/2008 | Consultation letter for draft tender regulations - (Reference Number: 108/08) |
| 24/07/2008 | DCP008 Provision of Urgent Metering Service |
| 24/07/2008 | CJWG Stakeholder briefing 24 July 2008 |
| 23/07/2008 | Ofgem Presentation from Offtake Assessment Workshop on 22 July 2008 |
| 22/07/2008 | Delivering the electricity distribution structure of charges project: decision on a common methodology for use of system charges from April 2010, consultation on the methodology to be applied across DNOs and consultation on governance arrangements - (Reference Number: 104/08) |
| 21/07/2008 | Ofgem annual report 2007-2008 - (Reference Number: 102/08) |
| 21/07/2008 | Ofgem annual report 2007-2008 - (Reference Number: 102/08) |
| 21/07/2008 | MCP185 Revised processes for Event of Default and Breaches of the MRA |
| 21/07/2008 | Gas National Transmission System Offtake Arrangements – Initial impact assessment on modification proposals - (Reference Number: 103/08) |
| 21/07/2008 | Gas National Transmission System Offtake Arrangements – Initial impact assessment on modification proposals - (Reference Number: 103/08) |
| 21/07/2008 | UNC207 Change to Telemetry Requirements in OAD for SOMSA Exit |
| 21/07/2008 | Vayu Limited - Notice of applications for a gas shipper licence and a gas supplier licence |
| 21/07/2008 | 13th MAMCoP Board Meeting |
| 18/07/2008 | Proposal to modify the non gas fuel poor network extensions incentive as outlined in gas distribution price control review final proposals document - (Reference Number: 100/08) |
| 18/07/2008 | Retaining the Transitional Interruption Incentive - (Reference Number: 101/08) |
| 18/07/2008 | P222 Provision of EAC and AA data to Distributors |
| 18/07/2008 | UNC204 Amendment to the calculation of WCF |
| 18/07/2008 | UNC211 Suspension of the RbD Audit |
| 17/07/2008 | Balancing and Settlement Code (BSC) modification proposals on zonal transmission losses |
| 17/07/2008 | Cover Letter - National Grid Electricity Transmission System Operator Incentive Scheme 2008/09, Transmission Losses: Revised Volume Targets - (Reference Number: 99/08) |
| 16/07/2008 | Ofgem clears up green tariff confusion - (Reference Number: R/26) |
| 16/07/2008 | The green supply guidelines: Updated proposals - (Reference Number: 97/08) |
| 16/07/2008 | CAP148 Impact Assessment - (Reference Number: 98/08) |
| 16/07/2008 | Customer Journey Workshop Minutes 3 July 2008 |
| 15/07/2008 | Modification of the Gas Transporter Licence Under Section 23 of the Gas Act 1986 |
| 15/07/2008 | Decision in relation to modification proposal 0012N/2008: Initial contributor housekeeping |
| 15/07/2008 | Decision in relation to modification proposal 0011Y/2008: One voltage level above the point of connection |
| 15/07/2008 | Decision in relation to modification proposal 0010N/2008: Apportionment rule housekeeping |
| 15/07/2008 | Decision in relation to modification proposal 0010Y/2008: Apportionment rule housekeeping |
| 15/07/2008 | Decision in relation to modification proposal 0012Y/2008: Initial contributor housekeeping |
| 15/07/2008 | Decision in relation to modification proposal 0011N/2008: One voltage level above the point of connection |
| 15/07/2008 | SSE Hornsea Limited - Notice of application for a gas shipper licence |
| 14/07/2008 | Joint Regulator Group Minutes 27 March 2008 |
| 11/07/2008 | Social Action Strategy update 2008-2009 |
| 11/07/2008 | Incremental Entry Capacity Release (IECR) Methodology Statement 2008 |
| 09/07/2008 | Ofgem response to Scottish Executive's consultation on reform of the Renewables Obligation in Scotland |
| 09/07/2008 | Ofgem response to DETI's consultation on reform of the Northern Ireland Renewables Obligation |
| 09/07/2008 | Ofgem Decision CSL Proposal to Modify Storage Services Contract |
| 08/07/2008 | Minutes of the meeting 22 May 2008 |
| 07/07/2008 | 2007-08 Summary Financial Review |
| 04/07/2008 | Ofgem is not the telecoms regulator - Daily Mirror mistake |
| 04/07/2008 | DPCR5 August Forecast Business Plan Questionnaire Tables |
| 04/07/2008 | DPCR5 Financial Issues High Level Forecast Business Plan Questionnaire |
| 03/07/2008 | National Grid Gas System Operator Incentives from 1 April 2008: Environmental Incentive Methane Emissions: Final Proposals - (Reference Number: 96/08) |
| 03/07/2008 | Terms of reference April presentation |
| 03/07/2008 | Customer Journey Workshop minutes 17 June 2008 |
| 02/07/2008 | DCPR 4 reopener letter - tree cutting and building clearance |
| 02/07/2008 | Consultation and impact assessment on EDFs proposal to introduce a revised methodology for its SPN network:LRIC model and HV/LV generator charging - (Reference Number: 95/08) |
| 02/07/2008 | PR-08-003 Scottish Power - IDNO charging proposal under a G3 methodology |
| 02/07/2008 | Regulatory arrangements for East West Cable One Ltd's two proposed GB-Irish electricity interconnectors - (Reference Number: 94/08) |
| 01/07/2008 | Ofgem codes review will pave way for new and small players - (Reference Number: R/25) |
| 01/07/2008 | gas_meter_readers_2008(ver25) |
| 01/07/2008 | G07 Black Start |
| 01/07/2008 | iGT UNC013 Inspection Notification File Format and Response File |
| 01/07/2008 | iGT UNC015 Use of Unbundled Meter Readings File Format and Response Files for Cyclic Meter Readings |
| 01/07/2008 | iGT UNC014 "iGT Meter Reading Validation Rules and Rejection Codes" within iGT UNC |
| 01/07/2008 | iGT UNC016 Submission of More Frequent Cyclic Meter Readings |
| 01/07/2008 | Complaint Handling Standards Decision July 2008 - (Reference Number: 93/08) |
| 30/06/2008 | Environmental Issues and the code objectives - Final Clarification and Guidance - (Reference Number: 91/08) |
| 30/06/2008 | An independent critique of the codes governance arrangments, commissioned by Ofgem and prepared by Brattle and Simmons and Simmons |
| 30/06/2008 | Review of industry codes governance - scope of review - (Reference Number: 92/08) |
| 30/06/2008 | Modification of the gas transporter licence under section 23 of the Gas Act 1986 - (Reference Number: 90/08) |
| 26/06/2008 | Network reforms pave the way for massive increase in Britain's low carbon generating capacity - (Reference Number: R/24) |
| 26/06/2008 | Transmission Access Review - Final Report - (Reference Number: 89/08) |
| 26/06/2008 | Microgen Forum June 2008 |
| 24/06/2008 | Drax Power Limited - Notice of grant of a gas shipper licence |
| 23/06/2008 | Notice Under Section 8A(3) Electricity Act 1989 - ECG (Distribution) Ltd - (Reference Number: 88/08) |
| 20/06/2008 | UNC196 Alterations to shipper penalties for end user failure to interrupt |
| 20/06/2008 | UNC203V Revision to DN Shrinkage Regime |
| 19/06/2008 | New energy ombudsman appointed - (Reference Number: R/23) |
| 19/06/2008 | Distribution Code: Changes to the distribution code and engineering recommendations G83/1 |
| 18/06/2008 | Ofgem appoints new Director of Regulatory Review - (Reference Number: R/22) |
| 18/06/2008 | Clearing a path for growth in sustainable community electricity generation - (Reference Number: R/21) |
| 18/06/2008 | STCWG Mtg 3 (210208) - Agenda |
| 18/06/2008 | STCWG Mtg 1 (050208) - Agenda |
| 18/06/2008 | STCWG Mtg 2 (120208) - Agenda |
| 18/06/2008 | Long-Term Electricity Network Scenarios (LENS) Third Workshop |
| 18/06/2008 | Distributed Energy - Further Proposals for More Flexible Market and Licensing Arrangements - (Reference Number: 87/08) |
| 18/06/2008 | Offtake arrangements and market access for small-scale distributed energy generators |
| 18/06/2008 | Letter to tOSl May 08 |
| 18/06/2008 | Redress schemes - conditional approval letter to tOSI |
| 17/06/2008 | BBL interconnector expansion – approval of tariff |
| 17/06/2008 | Consultation on Scottish Power’s (SP) proposal for a longer term charging methodology: FCP model - (Reference Number: 86/08) |
| 17/06/2008 | Customer Journey Workshop minutes 3 June 2008 |
| 16/06/2008 | UNC185VV Meter Error Notification Process |
| 13/06/2008 | MRA 183 Clarification of the use of the Change of Tenancy Indicator |
| 13/06/2008 | CAP144 Emergency Instruction to emergency de-energise |
| 13/06/2008 | A08 Emergency Instruction to Emergency De-Energise |
| 13/06/2008 | Offshore Electricity Transmission - A Joint Ofgem/BERR Regulatory Policy Update - (Reference Number: 84/08) |
| 13/06/2008 | Carbon Emissions Reduction Target (CERT) 2008-2011 - (Reference Number: 85/08) |
| 12/06/2008 | Ofgem City Briefing on 11/06/08 - presentation |
| 12/06/2008 | Decision in relation to proposal ENW-2009-002 to modify the connection charging statement: System study charges |
| 11/06/2008 | Invitation to Transmission Codes Workshop |
| 10/06/2008 | National Grid's consultation on energy supplies for Winter 2008-2009 published - (Reference Number: R/20) |
| 10/06/2008 | Winter Outlook 2008/09 Consultation - (Reference Number: 83/08) |
| 09/06/2008 | Ofgem appoints new Director, Trading Arrangements - (Reference Number: R/19) |
| 09/06/2008 | OFGEM – Organisational structure |
| 06/06/2008 | CAP131 - User Commitment for New and Existing Generators Impact Assessment - (Reference Number: 81/08) |
| 06/06/2008 | UNC190 Clarification of Aggregation of Credit Positions using a Guarantee from a Security Provider |
| 06/06/2008 | Gas Post-Emergency Metering Services - Results of Information Request and Revised Guidelines - (Reference Number: 82/08) |
| 05/06/2008 | A report by PÖYRY Energy Consulting produces for the Gas Forum: Audit of National Grid's Interim Transfer and Trade Process - (Reference Number: 80/08) |
| 05/06/2008 | Customer Journey Workshop Minutes 21 May 2008 |
| 04/06/2008 | DCP022 Annual Rebate by Cheque |
| 04/06/2008 | Customer Journey Workshop Minutes 6 May 2008 |
| 03/06/2008 | Minutes of the meeting of 24 April 2008 |
| 02/06/2008 | EDFE 021: EDF Energy Networks UoS Charging Methodology Modification. Introduction of a power flow/LRIC based methodology and implementation in EDF Energy Networks’ south East Region |
| 02/06/2008 | Bord Gais Eireann - Notice of revocation of gas supplier licence and reasons for revocation |
| 02/06/2008 | Viridian Energy Limited - Notice of grant of a gas shipper licence |
| 02/06/2008 | EDF Energy (West Burton Power) Limited - Notice of grant of an electricity generation licence |
| 02/06/2008 | Tethra Energy Limited - Notice of grant of a gas shipper licence |
| 02/06/2008 | EEC Update Issue 24 |
| 02/06/2008 | Ofgem Customer Journey Workshop Minutes 15 April 2008 |
| 02/06/2008 | Customer Journey Workshop Minutes 3 April 2008 |
| 01/06/2008 | Environmental Advisory Group meeting June 2008 - Agenda |
| 30/05/2008 | Ofgem publishes fuel poverty action programme - (Reference Number: R/18) |
| 30/05/2008 | 2007-08 Connections Industry Review (CIR) unpopulated IDNO reporting template (IDNO) |
| 30/05/2008 | 2007-08 Connections Industry Review (CIR) unpopulated GDN reporting template (GDN) |
| 30/05/2008 | 2007-08 Connections Industry Review (CIR) unpopulated DNO reporting template (DNO) |
| 30/05/2008 | 2007-08 Connections Industry Review (CIR) unpopulated IGT reporting template (IGT) |
| 30/05/2008 | ECSG Minutes Aprill 2008 |
| 30/05/2008 | NOTICE UNDER SECTION 23 OF THE GAS ACT 1986 - (Reference Number: 73/08) |
| 30/05/2008 | Open letter PPM Customer Switching |
| 30/05/2008 | Fuel Poverty Summit Action Programme |
| 30/05/2008 | TPCR Gas Entry Baseline Review - Final Proposals - (Reference Number: 72/08) |
| 30/05/2008 | Modification and Notice Under Section 6(1)(C) and 49A of the Electricity Act 1989 – amendment of DNO's Special Condition A1 - (Reference Number: 74/08) |
| 30/05/2008 | Modification and Notice Under Section 6(1)(C) and 49A of the Electricity Act 1989 - Collective Licence Modification to introduce proposed licence conditions of the Distribution Licence Review - (Reference Number: 78/08) |
| 30/05/2008 | Modification and Notice Under Section 6(1)(C) and 49A of the Electricity Act 1989 - addition of Special Condition J to SHEPDL licence - (Reference Number: 76/08) |
| 30/05/2008 | Modification and Notice Under Section 6(1)(C) and 49A of the Electricity Act 1989 - removal of BA conditions 2, 3 and 4 from IDNO licences - (Reference Number: 79/08) |
| 30/05/2008 | Modification and Notice Under Section 6(1)(C) and 49A of the Electricity Act 1989 – amendment of PLC 42 in Central Networks licences - (Reference Number: 75/08) |
| 30/05/2008 | Modification and Notice Under Section 6(1)(C) and 49A of the Electricity Act 1989 – amendment of PLC 24 in SHEPDL licence - (Reference Number: 77/08) |
| 30/05/2008 | Consultation on Modification to Standard Licence Conditions - (Reference Number: 71/08) |
| 29/05/2008 | Modification of the gas transporter licence under section 23 of the Gas Act 1986 - (Reference Number: 69/08) |
| 29/05/2008 | Monitoring suppliers' social initiatives - proposed reporting framework - (Reference Number: 68/08) |
| 29/05/2008 | Section 23 Direction in respect of the removal from NGG's licence of the requirement to provide specific information in respect of NGG's SO Incentives - (Reference Number: 70a/08) |
| 29/05/2008 | Information Provision for 2008/09 SO Incentive Scheme: formal information request under paragraph 14 of special condition C5 of NGG's transporter licence - (Reference Number: 70b/08) |
| 28/05/2008 | Ofgem fines National Grid £41.6m - (Reference Number: R/7) |
| 28/05/2008 | Decisionletter : Changes to the Distribution Code and Engineering Recommendation G83/1 |
| 28/05/2008 | Beauly-Denny Public Inquiry Income Adjusting Event - (Reference Number: 67/08) |
| 27/05/2008 | FAQ Document Renewable and CHP Register - (Reference Number: 2008/05) |
| 23/05/2008 | Long Term Electricity Network Scenarios (LENS) Project - Third Workshop Agenda |
| 23/05/2008 | UNC200 Introduction of a Date Tolerance to Facilitate the Processing of Individual Meter Point Reconciliation at LDZ CSEPs |
| 22/05/2008 | Decision Letter - Procedure for Dealing with Requests for Authority Consent Under Standard Licence Condition 15 of the Electricity Generation Licence |
| 22/05/2008 | DCode001 Changes to the Distribution Code and Engineering Recommendation G83/1 |
| 22/05/2008 | Approval of the NTS Exit Capacity Release Methodology Statement in respect of the Interim and Transitional Periods |
| 22/05/2008 | DPCR4 reopener open letter |
| 22/05/2008 | CJWG meeting dates |
| 21/05/2008 | Workshops on electricity distribution price control review - presentations |
| 21/05/2008 | Drax Power Limited - Notice of application for a gas shipper licence |
| 20/05/2008 | BBL Gas Interconnector Expansion - (Reference Number: 66/08) |
| 20/05/2008 | P218 Facilitating Microgeneration within the BSC |
| 19/05/2008 | UNC212 Revision of the Rough Storage Connection Agreement |
| 19/05/2008 | Haven Power Limited - Notice of reasons for extending licence to include domestic consumers |
| 19/05/2008 | Haven Power Limited - Direction extending electricity supply licence to include domestic consumers |
| 16/05/2008 | Direction given by the Gas and Electricity Markets Authority pursuant to Standard Special Condition A34 (Appointment of Compliance Officer) Wales and West Utilities |
| 16/05/2008 | Notice pursuant to Section 38A Gas Act 1986 Standard Special Condition A36 Southern Gas Networks |
| 16/05/2008 | Notice pursuant to Section 38A Gas Act 1986 Standard Special Condition A27 Scotland Gas Networks |
| 16/05/2008 | Notice pursuant to Section 38A Gas Act 1986 Standard Special Condition A36 Scotland Gas Networks |
| 16/05/2008 | Notice pursuant to Section 38A Gas Act 1986 Standard Special Condition A27 Wales and West Utilities Ltd |
| 16/05/2008 | Notice pursuant to Section 38A Gas Act 1986 Standard Special Condition A27 Northern Gas Networks |
| 16/05/2008 | Notice pursuant to Section 38A Gas Act 1986 Standard Special Condition A36 Northern Gas Networks |
| 16/05/2008 | Notice pursuant to Section 38A Gas Act 1986 Standard Special Condition A36 Wales and West Utilities Limited |
| 16/05/2008 | Notice pursuant to Section 38A Gas Act 1986 Standard Special Condition A27 Southern Gas Networks |
| 16/05/2008 | EDF Energy (IDNO) Ltd - Licence application consultation - (Reference Number: 65/08) |
| 16/05/2008 | ENW 2009-002: Proposal to modify the connection charging methodology and statements: system study charges |
| 15/05/2008 | DCP011 - Distribution Standard Licence Condition 36, 36A & 36C Review |
| 14/05/2008 | The Renewables Obligation 2006-2007: Facts and Figures - factsheet - (Reference Number: 75) |
| 14/05/2008 | Ofgem Resource Accounts 2007-08 - (Reference Number: 64/08) |
| 14/05/2008 | Long-Term Electricity Network Scenarios (LENS) Interim Report and third consultation - (Reference Number: 63/08) |
| 14/05/2008 | ENW 2009-001: proposal to modify the statement of use of system charging methodology: introduction of LDNO tariffs and HV/LV generator tariffs |
| 13/05/2008 | Ofgem recruits advisors from Britain's households - (Reference Number: R/17) |
| 13/05/2008 | Minutes of the meeting of 13 March 2008 |
| 12/05/2008 | Ofgem appoints new director - (Reference Number: R/16) |
| 12/05/2008 | National Grid System Operator Incentives from April 2009 |
| 09/05/2008 | Notice under section 23 of Gas Act 1986 - to modify Special Condition C8G - (Reference Number: 62/08) |
| 09/05/2008 | Note on 12th QofS Working Group Meeting |
| 09/05/2008 | Note of the 13th QofS Working Group Meeting |
| 09/05/2008 | SP PR 08 002: proposal to modify the use of system charging methodology: introduction of FCP model |
| 09/05/2008 | E.ON Energy Trading AG - Notice of grant of a gas shipper licence |
| 08/05/2008 | Impact of Larger Generating Units on GB Electricity Supply Frequency - Standards and Governance - (Reference Number: 61/08) |
| 07/05/2008 | Open Letter - European Public Limited Liability Companies (Societas Europaea) and licence requirements |
| 06/05/2008 | Authority approval of IPNLs use of system charging methodology |
| 06/05/2008 | Authority approval of ENCs use of system charging methodology |
| 06/05/2008 | Consultation on proposals from Scottish Power Distribution and Scottish Power Manweb to modify Use of System charges for Independent Distribution Network Operators (IDNOs) - (Reference Number: 59/08) |
| 02/05/2008 | Transmission Annual Report for 2006/07 - (Reference Number: 60/08) |
| 02/05/2008 | Authority's intention to consult on SPM PR-08-001a IDNO charging arrangements |
| 02/05/2008 | Imera Hydragrid Limited - Notice of grant of an electricity interconnector licence |
| 01/05/2008 | ROC and LEC issue timetable for 2008-09 |
| 01/05/2008 | CHP LEC Schedule 2008-09 |
| 01/05/2008 | The Inter-TSO Compensation scheme 2008 and 2009 - (Reference Number: 58/08) |
| 01/05/2008 | CAP150 Capacity Reduction |
| 01/05/2008 | Authority's intention to consult on SPD PR-08-001a IDNO charging arrangements |
| 01/05/2008 | SP PR 08 001a proposal to modify the statement of use of system charging methodology: IDNO charging |
| 01/05/2008 | UNC186/186A Provision of cost information |
| 01/05/2008 | UNC198 Extension of the Current Sunset Clauses for Registration of Capacity at NTS Exit Points |
| 01/05/2008 | UNC191V Discontinuance of Code Credit Rules |
| 29/04/2008 | Electricity Distribution Licence Review: Conclusions and Statutory Consultation - (Reference Number: 50/08) |
| 29/04/2008 | Notice Under Section 23(3) of the Gas Act 1986 |
| 29/04/2008 | Notice under Section 11(2) of the Electricity Act 1989 – addition of Special Condition J to SHEPDL licence - (Reference Number: 55/08) |
| 29/04/2008 | Notice under Section 11(2) of the Electricity Act 1989 – amendment of PLC 24 in SHEPDL licence - (Reference Number: 57/08) |
| 29/04/2008 | Notice under Section 11(2) of the Electricity Act 1989 – amendment of DNO's Special Condition A1 - (Reference Number: 54/08) |
| 29/04/2008 | Notice under section 11(2) of the Electricity Act 1989 – amendment of PLC 42 in Central Networks licences - (Reference Number: 53/08) |
| 29/04/2008 | Notice under section 11(2) of the Electricity Act 1989 removal of BA conditions 2, 3 and 4 from IDNO licences - (Reference Number: 52/08) |
| 29/04/2008 | Notice under section 11A(3) of the Electricity Act 1989 - Collective Licence Modification to introduce proposed licence conditons of the Distribution Licence Review - (Reference Number: 56/08) |
| 29/04/2008 | Information Provision in Respect of NGGs External System Operator Incentive Scheme - (Reference Number: 51/08) |
| 28/04/2008 | DCP020 Housekeeping re DCP012/009 |
| 28/04/2008 | Summer Outlook Seminar, London, 30 April 2008 |
| 25/04/2008 | Workshops for electricity distribution price control review - Open letter |
| 24/04/2008 | Draft Action Programme for Energy Summit |
| 24/04/2008 | Gas Distribution Price Control Review – Review of process open letter |
| 24/04/2008 | Witness statement of Sarah Harrison to the High Court re judicial review challenge against the Authority's decision not to take its final decisions concerning mod proposals to the Balancing and Settlement Code |
| 24/04/2008 | P216 Audit of LLF Production |
| 24/04/2008 | Detailed grounds of resistance re Judicial Review Challenge against the Authority's decision not to take its final decisions concerning mod proposals to the Balancing and Settlement Code |
| 24/04/2008 | Review of Competitive Metering - Deferral |
| 24/04/2008 | Review of Competitive Metering - Deferral |
| 23/04/2008 | Proposed Procedure – SLC 15 Electricity Generation Licence and Authority Procedure for Consent Requests - Open Letter Consultation - (Reference Number: 49/08) |
| 23/04/2008 | Ofgem-led summit pinpoints help on fuel poverty - (Reference Number: R/15) |
| 23/04/2008 | Switching Behaviour Amongst Vulnerable Customers |
| 23/04/2008 | MORI report on switching rates for vulnerable customers - (Reference Number: 47/08) |
| 23/04/2008 | Decision regarding the Entry Capacity Transfer and Trade Methodology Statement |
| 23/04/2008 | P215 Revised Credit Cover Methodology for Generating BM Units |
| 23/04/2008 | Closure Statement on SLC 28 Prepayment Meters |
| 23/04/2008 | Connection and Use of System Code (CUSC) Amendment Proposal CAP149: Transmission Entry Capacity with Restricted Rights Decision Notice - (Reference Number: 48/08) |
| 23/04/2008 | UNC187/187A Alterations to the RMSEC Auction to Accommodate Transfer and Trade of Capacity between ASEPs |
| 23/04/2008 | London Borough of Sutton - Notice of grant of a gas supply licence |
| 23/04/2008 | SPAA Change Proposal CP-08/110 Review of SCOGES Schedule 23 |
| 23/04/2008 | Ofgem Customer Journey Workshop Minutes 31 March 2008 |
| 22/04/2008 | Ofgem launches formal investigation into npower selling activities - (Reference Number: R/14) |
| 22/04/2008 | Ofgem Customer Journey Workshop Minutes 18 March 2008 |
| 21/04/2008 | Vulnerable Customer Engagement with the Energy Market Research - (Reference Number: 46/08) |
| 21/04/2008 | Letter to stakeholders on social monitoring - May 2008 |
| 21/04/2008 | UNC193 Removal of Certain "Gas not made available for offtake" Provisions from the UNC |
| 21/04/2008 | UNC171/171A Amendment of "User SP Aggregate Reconciliation Proportion" to incorporate historical AQ Proportions |
| 21/04/2008 | Tethra Energy Limited - Notice of application for a gas shipper licence |
| 21/04/2008 | Ofgem Customer Journey Workshop Minutes 18 February 2008 |
| 18/04/2008 | Pro forma questionaire on the cost impacts of enduring gas offtake and incentives (cover letter) - (Reference Number: 45/08) |
| 17/04/2008 | Section 23 Direction to Modify NGG's gas transporter licence in respect of the restriction of prices for LNG storage services from 1 May 2008 - (Reference Number: 44/08) |
| 17/04/2008 | Transmission Access Review – Analytical Discussion Document - (Reference Number: 43/08) |
| 17/04/2008 | UNC172 Transporter Obligations Pertaining to Void and Vacant Sites |
| 16/04/2008 | UGI034/GTC343/GPL042 Mandatory Use of Defined File Formats For Change of Supply and Change of Supply Meter Readings |
| 16/04/2008 | iGT UNC001VV iGT Standards of Service |
| 16/04/2008 | iGT UNC011 Timing of Calculation of Estimated Meter Readings by Pipeline Operator |
| 16/04/2008 | iGT UNC012 Amendment to the window for acceptance of Meter Reads by Pipeline Operators |
| 15/04/2008 | Proposed Guidance - Environmental Issues and the Code Objectives Open Letter Consultation - (Reference Number: 41/08) |
| 15/04/2008 | STC Working Group on Offshore Electricity Transmission - Final Report |
| 15/04/2008 | DCP010 Notification and publication of rota load block alpha identifier |
| 15/04/2008 | Summer Outlook Report 2008 - (Reference Number: 42/08) |
| 14/04/2008 | Section 23 Direction to Modify NGG's transporter licence in respect of SO Incentives from 1 April 2008 - (Reference Number: 40/08) |
| 11/04/2008 | User Pays arrangements |
| 11/04/2008 | Viridian Energy Limited - Notice of application for a gas shipper licence |
| 11/04/2008 | EDF Energy (West Burton Power) Limited - Notice of application for an electricity generation licence |
| 10/04/2008 | DCP015 Limitation on claiming DCUSA expenses to one attendee per Group within a Party category |
| 09/04/2008 | Ofgem forces companies to raise game on complaint handling - (Reference Number: R/13) |
| 08/04/2008 | Ofgem launches Competition Act investigation into Scottish Power Limited and Scottish and Southern Energy plc - (Reference Number: R/12) |
| 07/04/2008 | Minutes of the meeting of 21 February 2008 |
| 07/04/2008 | CE 2008 0008N: decision in relation to a modification to the connection charging methodology and statement: removal of references to P2/5 and IUS |
| 07/04/2008 | CNE 2008 02: decision relating to a modification to the statement of use of system charging methodology: capacity build-up on embedded networks |
| 07/04/2008 | CNW 2008 03: decision relating to a modification to connection charging methodology and statement: capacity build-up on embedded networks |
| 07/04/2008 | CE 2008 0009N: decision in relation to a modification to the connection charging methodology and statement: contestability of live jointing on unmetered connections |
| 07/04/2008 | CNW 2008 02: decision relating to a modification to the statement of use of system charging methodology: capacity build-up on embedded networks |
| 07/04/2008 | CNE 2008 03: decision relating to a modification to connection charging methodology and statement: capacity build-up on embedded networks |
| 07/04/2008 | CE 2008 0008Y: decision in relation to a modification to the connection charging methodology and statement: removal of references to P2/5 and IUS |
| 07/04/2008 | UNC188 Introduction into the UNC of the Agency Charging Statement |
| 04/04/2008 | Electricity Distribution Price Control Review: Price Control Cost Reporting Rules:Instructions and Guidance (version 3) February 2008 |
| 04/04/2008 | Direction issued by the Gas and Electricity Markets Authority to relevant electricity distributors under part D (establishment of the price control review reporting rules) of standard condition 52 |
| 04/04/2008 | Consultation on modifications to Statements of the Basis for Transmission Owner Charges - (Reference Number: 38/08) |
| 03/04/2008 | Electricity Distribution Price Control Revenue Reporting: Regulatory Instructions and Guidance - Version 4 - (Reference Number: 37/08) |
| 03/04/2008 | Renewables and CHP Register Authorisation form |
| 02/04/2008 | Switching rate hits 5.1 million in 2007 - (Reference Number: R/11) |
| 02/04/2008 | Carbon Monoxide Working Group 1st meeting (24-04-08) |
| 02/04/2008 | Open letter consultation on National Grid proposal to commence generating electricity at pressure reduction sites |
| 02/04/2008 | P220 Provision of new data items for improving market information |
| 02/04/2008 | P219 Consistency between Forecast and Out-turn Demand |
| 02/04/2008 | Delivering the electricity distribution structure of charges project - (Reference Number: 36/08) |
| 02/04/2008 | Information request to NGET08 |
| 02/04/2008 | Information request to NGET - losses08 |
| 01/04/2008 | Renewables and CHP Register User Guide |
| 01/04/2008 | Renewables and CHP Register Workshop Q&A |
| 01/04/2008 | Climate Change Levy expemption for Combined Heat and Power (CHP): Guidance for exporting 'good quality' CHP generators and Suppliers |
| 01/04/2008 | How to apply |
| 01/04/2008 | Renewable Energy Guarantees of Origin: Ofgem’s administration procedures |
| 01/04/2008 | UNC182 Information Provision at LNG Importation Facilities |
| 01/04/2008 | International Power Plc - Notice of revocation and reasons for revocation of gas shipper licence |
| 01/04/2008 | ConocoPhillips Petroleum Company UK Ltd - Notice of revocation and reasons for revocation of gas shipper licence |
| 01/04/2008 | TXU Europe Energy Trading Limited - Notice of revocation and reasons for revocation of gas shipper licence |
| 01/04/2008 | Imera Hydragrid Limited - Notice of grant of electricity interconnector licence |
| 01/04/2008 | Open letter - new technology in public lighting - (Reference Number: 35/08) |
| 01/04/2008 | Reviewing the microgeneration market |
| 31/03/2008 | Corporate strategy and plan 2008-2013 - (Reference Number: 34/08) |
| 31/03/2008 | Guidance on Impact Assessments March 2008 - (Reference Number: 33/08) |
| 31/03/2008 | Modification to the DN operator's Gas Transporter licence of Wales & West Utilities limited pursuant to section 23 of the Gas Act 1986 |
| 31/03/2008 | Modification of the DN operator's Gas Transporter licence of Northern Gas Networks limited pursuant to section 23 of the Gas Act 1986 |
| 31/03/2008 | Modification pursuant to section 23 Gas Act 1986 of all Gas Transporter licences granted or treated as granted under section 7 of the Gas Act 1986 |
| 31/03/2008 | Modification pursuant the NTS operators Gas Transporter licence of National Grid Gas Plc pursuant to section 23 of the Gas Act 1986 |
| 31/03/2008 | Modification of the DN operator's Gas Transporter licence of Southern Gas Networks Plc pursuant to section 23 of the Gas Act 1986 |
| 31/03/2008 | Modification pursuant to standard special condition A2 of all NTS operator and DN operator Gas Transporter licences granted or treated as granted under section 7 of the Gas Act 1986 |
| 31/03/2008 | Modification of the DN operator's Gas Transporter licence of Wales & West Utilities limited pursuant to section 23 of the Gas Act 1986 |
| 31/03/2008 | Modification of the DN operator's Gas Transporter licence of Scotland Gas Networks Plc pursuant to section 23 of the Gas Act 1986 |
| 31/03/2008 | Modification pursuant to standard special condition D2 of all DN operator Gas Transporter licences granted under section 7 of the Gas Act licences granted under section 7 of the Gas Act licences granted under section 7 of the Gas Act 1986 |
| 31/03/2008 | Modification of Gas Transporter licences pursuant to section 23 of the Gas Act 1986 |
| 31/03/2008 | Modification to the DN operator's Gas Transporter licence of Northern Gas Networks limited pursuant to section 23 of the Gas Act 1986 |
| 31/03/2008 | Determination pursuant to section 33BA of the Gas Act 1986 |
| 31/03/2008 | Modification to the DN operator's Gas Transporter licence of Scotland Gas Networks Plc pursuant to section 23 of the Gas Act 1986 |
| 31/03/2008 | Modification pursuant to section 23 of the Gas Act 1986 of all Gas Transporter licences granted or treated as granted under section 7 of the Gas Act 1986 |
| 31/03/2008 | Modification to the DN operator's Gas Transporter licence of National Grid Gas Plc pursuant to section 23 of the Gas Act 1986 |
| 31/03/2008 | UNC180V Replacement of file formats contained within Annex A Part 7 of the LDZ CSEP NExA |
| 31/03/2008 | UNC183 Provision of Data in respect of downstream networks by the iGT directly connected to the distribution network |
| 31/03/2008 | SMPS Response 31_03 _08 |
| 31/03/2008 | Annual Review BPS and PG |
| 31/03/2008 | Section 11 Direction for NGET's SO Incentives from 1 April 2008 |
| 28/03/2008 | Ofgem launches electricity distribution price control review - (Reference Number: R/10) |
| 28/03/2008 | xoserve Agency charging statement |
| 28/03/2008 | SECTION 11 and 49A(1) of Electricity Act 1989 - Recovering the Costs of Temporary Physical Disconnection - CAP048 - (Reference Number: 31/08) |
| 28/03/2008 | Electricity Distribution Price Control Review Initial Consultation Document - (Reference Number: 32/08) |
| 28/03/2008 | Update on zonal transmission losses proposals |
| 28/03/2008 | F07 Grid Code Requirements for Current Sourced DC Links |
| 27/03/2008 | Energy Supply Markets Probe - Call for Evidence - (Reference Number: 30/08) |
| 27/03/2008 | UNC mod 90 - Interruptible Capacity Methodology Statement |
| 27/03/2008 | Final ARM Letter March 08 |
| 27/03/2008 | SECTION 11 AND SECTION 49A(1) OF ELECTRICITY ACT 1989 - SPTL SF6 Incentive Scheme Licence Modification - (Reference Number: 29/08) |
| 26/03/2008 | Activation of Special Standard Licence Condition A40 for Scotland Gas Networks plc |
| 26/03/2008 | Activation of Standard Special Condition A40 for Northern Gas Networks Limited |
| 26/03/2008 | Activation of Standard Special Condition A40 for Southern Gas Networks plc |
| 26/03/2008 | Activation of Special Standard Licence Condition A40 for Wales and West Utilities Limited |
| 26/03/2008 | Activation of Standard Special Condition A40 for National Grid Gas plc |
| 26/03/2008 | Haven Power Limited - Notice of application for an extension to electricity supply licence |
| 25/03/2008 | CHP LECs issued |
| 25/03/2008 | G06 Power Park Modules and Synchronous Generating Units |
| 20/03/2008 | TPCR Gas Entry Baseline Review - Impact Assessment - (Reference Number: 28/08) |
| 20/03/2008 | DCP012 Introduction of contractual arrangements for the provision of use of system between one distributor and another distributor |
| 19/03/2008 | Decision of the Gas & Electricity Markets Authority following an investigation into National Grid - (Reference Number: 27/08) |
| 19/03/2008 | The Gas (Standards of Performance)(Amendment) Regulations 2008 |
| 18/03/2008 | Offshore Transmission - Tender Process Workshop, 22 February 2008 |
| 18/03/2008 | Transmission Tender Workshop Presentation Slides 22 February 2008 |
| 18/03/2008 | List of revoked ROCs |
| 18/03/2008 | ROCs purged from the ROC Register |
| 18/03/2008 | CNW 004: decision relating to a modification to the connection charging methodology: CAF clarification |
| 18/03/2008 | CNE 004: decision relating to a modification to the connection charging methodology: CAF clarification |
| 18/03/2008 | Good Energy Gas Limited - Notice of grant of a domestic gas supply licence |
| 18/03/2008 | Energy24 Limited - Notice of grant of a gas shipper licence |
| 17/03/2008 | Industry Codes Governance Review – Open letter on Brattle Critique |
| 14/03/2008 | Presentation by Juliet Davenport (Good Energy) to the Powering The Energy Debate on 28 Feb 2008 |
| 14/03/2008 | Sara Vaughan (Eon) presentation to the Powering the Energy Debate on 28 Feb 2008 |
| 14/03/2008 | Mark Feather (Ofgem) Presentation to The Powering the Energy Debate on 28 Feb 2008 |
| 14/03/2008 | Presentation by Alison Kay (NG) to the Powering the Energy Debate 28 Feb 2008 |
| 14/03/2008 | Nick Durlacher (BSC Panel Chair) presentation to the Powering the Energy Debate 28 Feb 2008 |
| 14/03/2008 | Presentation by Jeremy Sainsbury (SRF) to The Powering The Energy Debate on 28 Feb 2008 |
| 14/03/2008 | Nigel Cornwall (CEA) presentation to the Powering The Energy Debate on 28 Feb 2008 |
| 13/03/2008 | UNC189 Amendment to the QSEC Auction Timetable |
| 13/03/2008 | E.ON Energy Trading AG - Notice of application for a gas shipper licence |
| 13/03/2008 | Revised Section 23 Notice for National Grid Gas's SO incentives from 1 April 2008 - (Reference Number: 25/08) |
| 11/03/2008 | Updated: Reviewing the microgeneration market - factsheet - (Reference Number: 74) |
| 11/03/2008 | Better information and easier access to incentives needed for customers selling electricity generated in the home - (Reference Number: R/9) |
| 11/03/2008 | BERR Investor Offshore Conference 18th February 2008 - Presentation |
| 11/03/2008 | Minister for Energy's Opening Address to the Offshore Wind and Transmission Investor Conference |
| 11/03/2008 | Review of the market for exported electricity from microgeneration - (Reference Number: 24/08) |
| 10/03/2008 | Notice under Section 23 of the Gas Act 1986 - (Reference Number: 23/08) |
| 07/03/2008 | Customer Expectations & WTP For Improvements in Service from Electricity DNOs |
| 07/03/2008 | Consumer research 4th working group - Ofgem |
| 07/03/2008 | Open Letter: Reporting arrangements applying to gas distribution networks - (Reference Number: 22/08) |
| 06/03/2008 | Alistair Buchanan at the SBGI, 06/03/08 |
| 06/03/2008 | Ofgem to review regulatory regime for energy networks - (Reference Number: R/8) |
| 06/03/2008 | Way Forward: Cutting the Green Customer Confusion |
| 05/03/2008 | Dudgeon Offshore Wind Limited - Notice of grant of an electricity generation licence |
| 05/03/2008 | Louis Dreyfus Energy Services L.P. - Notice of grant of a gas shipper licence |
| 05/03/2008 | Business Energy Solutions Limited - Notice of grant of a gas shipper licence |
| 05/03/2008 | London Borough of Sutton - Notice of application for a gas supply licence (without standard conditions) |
| 04/03/2008 | Renewables Obligation: Other Annual Reports: 2002 to 2006 |
| 04/03/2008 | Renewables Obligation Annual Report 2006-07 - (Reference Number: 21/08) |
| 04/03/2008 | Direction issued to National Grid Gas plc by the gas and Electricity Markets Authority pursuant to paragraph 10 of Special Condition C8D of the gas transporter licence in respect of the NTS |
| 29/02/2008 | Open letter on BSC modification proposals P211 and P217 |
| 29/02/2008 | P212 Main imbalance price based on market reference price |
| 29/02/2008 | Open letter on BSC modification proposals P211 and P217 |
| 29/02/2008 | P212 Main imbalance price based on market reference price |
| 28/02/2008 | iGT UNC002vv Portfolio extract |
| 27/02/2008 | Carbon Emission Reduction Target Proforma |
| 27/02/2008 | Minutes of the meeting of 16 January 2008 |
| 27/02/2008 | ECSG minutes 31 January 2008 |
| 27/02/2008 | UNC 0116: enduring offtake - update on next steps following the Competition Commission's decision |
| 27/02/2008 | NG Electricity Transmission and National Grid Gas SO incentives from 1 April 2008 - (Reference Number: 19/08) |
| 27/02/2008 | Offshore Electricity Transmission - Open letter to Industry |
| 27/02/2008 | EEC Update Issue 23 |
| 26/02/2008 | Summary of Responses to Ofgem's Consultation on the CERT Supplier Guidance |
| 26/02/2008 | CAP048: Recovering the Costs of Compensation for Temporary Physical Disconnection Section 11 Licence Consultation - (Reference Number: 18/08) |
| 26/02/2008 | CAP159 Arrangements fpr CUSC Mid-Term elections |
| 26/02/2008 | DCP013 - Change Determination Notices to Distributors |
| 26/02/2008 | DCP014 Amendment to Clause 8 "Cost of the DCUSA" |
| 26/02/2008 | DSWG December minutes |
| 25/02/2008 | Ofgem fines National Grid £41.6M - (Reference Number: R/7) |
| 25/02/2008 | Terms of reference for the Standard Licence Conditions Working Group |
| 25/02/2008 | Notice Under Section 11(2) of the Electricity Act 1989 - SPTL SF6 Incentive Scheme - (Reference Number: 15/08) |
| 22/02/2008 | Offshore Transmission Embedded Transmission Working Group (OTETWG) Report - (Reference Number: 14/08) |
| 22/02/2008 | P221 Amendments to the Balancing and Settlement Code to reflect changes to the Fuel Security Code |
| 22/02/2008 | EDF Energy (IDNO) Limited - Notice of application for a electricity distribution licence. |
| 22/02/2008 | Decision Document: Regulation of marketing to domestic customers - (Reference Number: 20/08) |
| 22/02/2008 | Carbon Emissions Reduction Target 2008-2011, Market Transformation Action |
| 21/02/2008 | Ofgem launches probe into energy supply markets - (Reference Number: R/6) |
| 21/02/2008 | Gas Distribution Price Control: Statutory consultation on the licence modifications - (Reference Number: 13/08) |
| 21/02/2008 | DCP009 Distribution Standard Licence Condition 4a review |
| 21/02/2008 | UNC184 Requirement for Partial non-business days for the purpose of the UK Link Technology refresh (UKLTR) Project |
| 20/02/2008 | TXU Europe (AHG Shipping Services) Limited - Notice of revocation and reasons for revocation of gas shipper licence |
| 15/02/2008 | Case Closure Statement by the Gas and Electricity Markets Authority, following an investigation into alleged non-compliance by SP Distribution Limited with Standard Licence Condition 4C of their Electricity Distribution Licence - (Reference Number: 12/08) |
| 15/02/2008 | DSWG February 2008 Agenda |
| 15/02/2008 | In service testing report for the meeting on 10th of jan 2008 |
| 15/02/2008 | Distributed Energy - Initial proposals for more flexible market and licensing arrangements - 295/07 |
| 14/02/2008 | Imera Hydragrid Limited - Notice of application for Electricity Interconnector (UK-Belgium) Licence |
| 14/02/2008 | Modification of Electricity Transmission Standard Licence Conditions - Way Forward Document - (Reference Number: 11/08) |
| 14/02/2008 | Distributed Energy information sheet |
| 13/02/2008 | Invitation to Ofgem Offshore Transmission Tender Workshop |
| 13/02/2008 | Response to SSE Generation Licence - Standard Licence Conditions 16 and 16A |
| 13/02/2008 | iGT UNC 008 Ancillary Documents |
| 11/02/2008 | Minutes of the meeting of 13 December 2007 |
| 10/02/2008 | Minutes of the meeting of 22 November 2007 |
| 08/02/2008 | Timeline and way forward on NTS Gas Entry baselines |
| 08/02/2008 | Modification Proposal NTS GCM 10 ‘TO Entry Commodity Rebate Mechanism’ |
| 08/02/2008 | Modification Proposal NTS GCM 11 ‘Retrospective Negative TO Entry Commodity Charge’ |
| 08/02/2008 | Decision in relation to ENW/2008/005 modification proposal to connection charging methodology statement: update non-contestable charges |
| 08/02/2008 | Decision in relation to ENW/2008/008 modification proposal to connection charging statement: clarification of land rights and acquisitions methodology |
| 08/02/2008 | Decision in relation to ENW/2008/006 modification proposal to revise the interactive connection applications methodology |
| 08/02/2008 | Decision in relation to ENW/2008/010 modification proposal to UoS charging methodology statement: housekeeping changes (name change) |
| 08/02/2008 | Decision in relation to ENW/2008/007 modification proposal to connection charging methodology: revision of connection offer validity period |
| 08/02/2008 | Decision in relation to ENW/2008/009 modification proposal to connection charging methodology statement: housekeeping changes (name change) |
| 08/02/2008 | Decision in relation to ENW/2008/004 modification proposal to UoS charging methodology statement: update to Distributed Generation methodology |
| 08/02/2008 | Chive Fuels Limited - Notice of grant of a gas shipper licence |
| 08/02/2008 | Good Energy Gas Limited - Notice of application for a domestic gas supply licence |
| 07/02/2008 | iGT UNC 010 Alteration to Procedures for Modification Proposals to be discussed at iGT UNC Modification Panel |
| 07/02/2008 | iGT UNC 007v iGT RPC Invoice Template |
| 06/02/2008 | D07 Frequency Response Requirements |
| 05/02/2008 | Financial penalty decision by the Gas and Electricity Markets Authority, following a finding of breach by Northern Gas Networks Limited with its obligations under Standard Special Licence Condition D10 of the Gas Transporters Licence - (Reference Number: 10/08) |
| 04/02/2008 | Offshore Transmission Access and Compensation Workshop Notes and Slides - 03.12.07 |
| 04/02/2008 | Notice of Determination of Adjustment Factor for Scottish Hydro Electric - (Reference Number: 09/08) |
| 01/02/2008 | Agenda for Powering the Energy Debate |
| 01/02/2008 | CERT supplier guidance |
| 01/02/2008 | CERT supplier guidance |
| 01/02/2008 | Environmental Advisory Group meeting February 2008 - Agenda |
| 31/01/2008 | Transmission Access Review - Interim Report to the Secretary of State - (Reference Number: 08/08) |
| 31/01/2008 | CAP152-CAP155 Exhibit B, D, F and I Revisions WGAAs |
| 31/01/2008 | CAP157 Extension of Qualified Company Definition |
| 30/01/2008 | Imera Hydragrid Limited - Notice of application for Electricity Interconnector licence |
| 29/01/2008 | Cover letter of National Grid Gas response to information request on the availability of NTS exit flexibility capacity |
| 29/01/2008 | UNC165V Change to Measurement Provisions Change Process |
| 29/01/2008 | Energy24 Limited - Notice of application for a gas shipper licence |
| 28/01/2008 | The Renewables Obligation Buy-Out Price and Mutualisation Ceiling 2008/09 |
| 28/01/2008 | Specimen Contract (Operation Access & Maintenance) |
| 28/01/2008 | Specimen Contract (Connection to and use of Distribution System) |
| 28/01/2008 | OTETWG (Offshore Transmission Embedded Transmission Working Group) - Meeting 3 (28/01/08) - Minutes |
| 28/01/2008 | Specimen Contract (Major Connection) |
| 28/01/2008 | Terms of Reference for Embedded Transmission Working Group |
| 28/01/2008 | OTETWG (Offshore Transmission Embedded Transmission Working Group) - Meeting 3 (28/01/08) - Agenda |
| 28/01/2008 | Decision in relation to Central Networks modification proposal CN003 to the connection charging methodology: clarification of the apportionment rules |
| 28/01/2008 | Decision letter in relation to modification proposal to the connection charging methodology: clarification of the apportionment rules |
| 28/01/2008 | CA028 Amendment to Governance Framework Timescales |
| 28/01/2008 | Gazprom Marketing & Trading Retail Limited - Consent to transfer of licence from Gazprom Marketing & Trading Limited |
| 25/01/2008 | npower needs to do more to help customers in debt - (Reference Number: R/4) |
| 25/01/2008 | Ofgem bids farewell to director of gas distribution - (Reference Number: R/5) |
| 25/01/2008 | Note of Ofgem/BERR joint external communications session - 25 January 2008 |
| 25/01/2008 | Offshore Transmission External Communication Session Consolidated Slide Pack - 25.01.2008 |
| 25/01/2008 | Debt and disconnection best practice review - (Reference Number: 07/08) |
| 25/01/2008 | Monitoring Company Performance Q3 2007 |
| 25/01/2008 | Authority approval of Laing O'Rourke's connection charging methodology |
| 25/01/2008 | Authority approval of Laing O'Rourke's use of system charging methodology |
| 25/01/2008 | CAP151 Construction Agreements Works Register |
| 25/01/2008 | CA027 Miscellaneous Amendments as a Consequential Effect of CA025 |
| 25/01/2008 | Business Energy Solutions Limited - Notice of application for a gas shipper licence |
| 24/01/2008 | Section 11A modification of standard licence condition C13 (Adjustments to use of system charges (small generators)) - (Reference Number: 06/08) |
| 24/01/2008 | P214 Issues relating to funds administration |
| 24/01/2008 | Section 11A modification of standard licence condition C13 (Adjustments to use of system charges (small generators)) - (Reference Number: 06/08) |
| 24/01/2008 | Shell Energy Europe B.V. - Notice of grant of a gas shipper licence |
| 24/01/2008 | Louis Dreyfus Energy Services L.P. - Notice of application for a gas shipper licence |
| 22/01/2008 | Offshore renewables to get connected with up to £2 billion investment - Joint Ofgem and Department for Business Enterprise and Regulatory Reform Press Release - (Reference Number: R/3) |
| 22/01/2008 | Demand Side Working Group December 2007 Agenda |
| 21/01/2008 | OTETWG (Offshore Transmission Embedded Transmission Working Group) - Meeting 2 (21/01/08) - Minutes |
| 21/01/2008 | OTETWG (Offshore Transmission Embedded Transmission Working Group) - Meeting 2 (21/01/08) - Agenda |
| 18/01/2008 | Winter to Date Seminar, London, 23 January 2008 |
| 17/01/2008 | Notice of proposals under section 33BAA of the Gas Act 1986 to prescribe standards of performance in regulations - (Reference Number: 05/08) |
| 17/01/2008 | TPCR Gas Entry Baseline Review Stakeholder Workshop - Presentations |
| 16/01/2008 | Market is sound - Ofgem assures Chancellor - (Reference Number: R/2) |
| 16/01/2008 | Decision in relation to CNE Dec 07: modification proposal to UoS methodology statement: New IDNO specific tariffs |
| 16/01/2008 | Decision in relation to CNW Dec 07: modification proposal to UoS charging methodology: New IDNO specific tariffs |
| 15/01/2008 | Updated: Household energy bills explained - factsheet |
| 15/01/2008 | Direction to Modify Scottish Power's Transmission Licence - Sloy - (Reference Number: 03/08) |
| 15/01/2008 | Direction to Modify Scottish Power's Transmission Licence - B5 Boundary - (Reference Number: 02/08) |
| 14/01/2008 | Proposed Corporate Strategy and Plan 2008-2013 - (Reference Number: 01/08b) |
| 14/01/2008 | Cover Letter for the Proposed Corporate Strategy and Plan 2008-2013 - (Reference Number: 01/08) |
| 14/01/2008 | Ofgem Resource Accounts 2006-07 |
| 14/01/2008 | Joint Regulator Group Minutes 6 December 2007 |
| 14/01/2008 | STC Working Group on Offshore Electricity Transmission |
| 14/01/2008 | OTETWG (Offshore Transmission Embedded Transmission Working Group) - Meeting 1 (14/01/08) - Agenda |
| 14/01/2008 | OTETWG (Offshore Transmission Embedded Transmission Working Group) - Meeting 1 (14/01/08) - Minutes |
| 14/01/2008 | CAP158 Provision of Interim Response Volume Information |
| 14/01/2008 | Offshore Electricity Transmission - Regulatory Policy Update - (Reference Number: 04/08) |
| 11/01/2008 | TPCR Gas Entry Baseline Review – Consultation Period Decision |
| 11/01/2008 | Essent Trading International SA - Notice of grant of gas shipper licence |
| 11/01/2008 | Gwynt Y Mor Offshore Wind Farm Limited - Notice of grant of an electricity generation licence |
| 11/01/2008 | UK Healthcare Corporation Limited - Notice of grant of a gas shipper licence |
| 10/01/2008 | Dudgeon Offshore Wind Limited - Notice of application for an electricity generation licence |
| 09/01/2008 | All Britain's gas distribution network owners accept Ofgem's 2008-2013 price controls - (Reference Number: R/1) |
| 09/01/2008 | Report on the Recommendations Arising from Additional Cost Benefit Analyses |
| 09/01/2008 | Recommendation for the Treatment of Offshore Power Station Demand |
| 09/01/2008 | January 2008 TPCR Gas Entry Baseline Review Workshop Invitation |
| 09/01/2008 | iGT UNC 006 Estimated Transportation Invoices |
| 08/01/2008 | Joint Regulator Group minutes 28 September 2007 |
| 08/01/2008 | Long Term Electricity Network Scenarios Second Workshop - Presentation |
| 07/01/2008 | Chive Fuels Limited - Notice of application for a gas shipper licence |